Keeping in head that good support is the key to cooperating with clientele, we strive to fulfill large good quality standards, offer aggressive rates and guarantee prompt shipping. In 2000, EPG took the guide in gaining ISO14001 atmosphere administration certification and thereafter handed the inspection of clean manufacturing and recycling economy, profitable the title of “Zhejiang Environmentally friendly Business”. Services & Good quality controlWe source in depth drawings and offer you whenever required. BT Collection Rack and Pinion EPT EPTT With One Acting
Functions
one time period Twin Pistion Rack
2 period Built-in Design
three period EPT Output EPTT
four period of time Integrated Style
5 time period EPTT Service EPT
6 period Stainless steel fasteners for EPTT phrase corrosion resistance
seven period of time The interface in between piston comma pinion and human body is produced of minimal friction materials
Specs
one rpar time period Strain Range colon Max time period functioning pressure 10bar
two rpar time period Air force colon two period5bar~8bar
3 rpar period of time Adjustment Range colon 90 deg pm5 deg
4 rpar time period Ambient temperature colon -twenty ~ plus90 degC
five rpar time period Type colon Solitary-performing lparEPT return rpar comma double-performing
6 rpar period of time Optional accessories colon solenoid valves comma restricted swap comma electric powered placement
7 rpar period Lubrication colon All the relocating components are coated with lubricants comma extending their provider existence
8 rpar interval EPT Time colon One particular million time
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rds
a period Interface among actuator and valve colon four or eight bolt orifices in accordance to DIN solISO
5211 comma the axle assembles orifice according to DIN 3337
b period Interface in between actuator and management valve colon 7100 D solS-7350 D solS according to
NAMUR or VDI solVDE 3845 comma 7040 D solS-7090 D solS connecting by means of the adapter plate
c time period Interface between actuator and sign box colon according to VDI solVDE 3845
Introduction
I interval EPTT Entire body
Boy substance is aluminium alloy period Inside and exterior floor are handled with anodic oXiHu (West EPT) Dis.dation and poEPTTng interval Outer surface area is nickle plated so that the anti-corrosion fuction of actuator and bare minimum friction towards pistons can be certain period
II time period Conclude EPTT
End protect substance is die-casting aluminium period of time Finish cover is treated with epoxy polyester so as to ideal ensure the anti-corrosion functionality period of time
III period Push Shaft
The EPT shaft materials is medium carbon metal with fantastic processing and nickle plating so that the pistons have EPT good quality in anti-corrosion comma anti-friction comma and so forth interval
IV interval Piston
Piston content is die-casting aluminium alloy interval Maxmium torque can be output when the actuator is actuated with specified pressure interval
V period of time Piston Seal
NBR-70 rubber sealing is used to make sure the normal and reputable performance of actuator underneath typical temperature period of time FPM can be also utilized according to clients apos needs period
VI period of time Travel Adjustment
Furthermore solMimus 5 diploma journey can be modified through the two bolts interval
EPT Present
Get in touch with
Many thanks for your checking out period
If you have any concerns about our items or company comma make sure you do not be reluctant to get in touch with us time period
Speak to Individual colon Olivia Hu
Brand name colon | KT solOEM |
Applicable Media colon | Water comma Oil comma Fuel comma Nitric Acid comma Acetic Acid |
Certification colon | CE solAPI solDNV solFDA solISO9001-2008 |
Sample Tests colon | One particular Sample for totally free lpar Beneath dollar10 rpar commaFreight Accumulate |
EPTT colon | Plastic Bag comma EPTT amp Plywood Case solAccording to customers apos need interval |
Payment colon | T solT comma L solC comma D solP comma Western EPT comma Paypal |
Port colon | HangEPT solZheJiang comma Customers apos Request |
Delivery Time colon | Within 35days following acquiring T solT deposit Payment |
Term of Delivery colon | FOB solCNF solCIF comma Customers apos Request |